lnu.sePublikasjoner
Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Mätning av produktionstiden vid prefabricerade hus: En tidsstudie vid Sävsjö Trähus AB
Växjö universitet, Fakulteten för matematik/naturvetenskap/teknik, Institutionen för teknik och design.
2007 (svensk)Independent thesis Basic level (degree of Bachelor), 10 poäng / 15 hpOppgave
Abstract [sv]

Vid prissättning av ett hus ingår produktionskostnaden och den utgör en stor andel av det totala priset. I produktionskostnaden ingår material, avskrivning samt löner. Kostnaden för löner är den mest svårbedömda eftersom husens storlek och arkitektur aldrig är lika. Ansvarige för offert och avtal använder sig idag av olika tillverkningsfaktorer vid beräkning och framtagning av offerter. Dessa är baserade på många års erfarenhet, där enheten antingen är timme/m2 eller timme/st beroende på vilken faktor som avses. Idag har man full kontroll över det totala täckningsbidraget, men det finns en viss osäkerhet vad gäller fördelningen mellan husen eftersom det ständigt cirkulerar flera hus i produktionen. I föreliggande examensarbete har ett flertal tidsstudier utförts för att granska tillverkningsfaktorerna och relationen mellan dem. Fabrikens produktionsflöde styrs av tillverkningen av ytterväggar varefter arbetet avgränsades till att främst mäta stationerna som monterar dessa. Resultatet av tidsstudien pekar på att yttervägg gjord i linan och gavelvägg gjord i vändbänken har en för hög faktor i det nuvarande systemet. Vidare mättes fönster som monterades löst i ett färdigt block och fönster som reglades i fönsterbänk. Båda dessa faktorer resulterade i en för låg faktor jämfört med nuvarande. Andra faktorer som mättes var yttervägg vändbänk, gavelspets och locpanel. I samband med tidsstudien, som utfördes under totalt 4 veckors tid, granskades även produktionsprocessen vilket resulterade i några förslag på åtgärder som förbättrar effektivitet, kvalitet och säkerhet i fabriken. Att fördela arbetet på ett bättre sätt i linan vid produktion av panelhus är ett av förslagen som skulle höja effektiviteten.

Abstract [en]

Price-setting of a house includes production-cost and the production-cost is a substanial part of the total price. In production-cost are material, write-offs and salaries included. The last mentioned factor is the one that is most difficult to determine since the house-sizes and architectures never are the same. The person responsible for tender and making deals are today using factors of manufacturing which are based upon many years of experience and where the measurement is either h/m2 or h/pc depending on which factor one uses. The total covering-costs is good totally, but one does not know whether the proportions between different house-types is accurate since it constantly circulates multiple different houses in production. In this examination-work has multiple time-studies been made to research the factors of manufacturing and the proportion of them. The production-flow of the factory is controlled of the manufacturing of outer-walls and therefore the studies narrowed down to measure the stations that are assembling these. The results of the time-study showed tendencies that outer-walls made in the line and gables made at the turning-table have a factor that is high in the present system. Windows that was installed loose in a partition and windows that were studded in windowsill were also measured. Both these factors resulted in a low factor comparing to the presence.During the time-study, that lasted four weeks of time, was even the production-process researched and resulted in suggestions for changes that could increase efficiency, quality and security in the factory. One of the suggestions that could result in more efficiency was dividing the workload more efficiently in production of prefabricated houses.

sted, utgiver, år, opplag, sider
2007. , s. 36
Emneord [sv]
Sävsjö Trähus AB, Tidsstudie, Tillverkning
HSV kategori
Identifikatorer
URN: urn:nbn:se:vxu:diva-1527OAI: oai:DiVA.org:vxu-1527DiVA, id: diva2:205349
Uppsök
teknik
Veileder
Examiner
Tilgjengelig fra: 2007-08-22 Laget: 2007-08-22 Sist oppdatert: 2010-03-10bibliografisk kontrollert

Open Access i DiVA

fulltekst(4570 kB)1083 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 4570 kBChecksum SHA-1
c42e69d88bd4425163ac6c878dd86adebb060dbd2c35e7605835932261f65974951242dc
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 1083 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 1189 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf