lnu.sePublikasjoner
Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Internal material handling at Volvo Construction Equipment Braås
Växjö universitet, Fakulteten för humaniora och samhällsvetenskap, Ekonomihögskolan, EHV.
Växjö universitet, Fakulteten för humaniora och samhällsvetenskap, Ekonomihögskolan, EHV.
Växjö universitet, Fakulteten för humaniora och samhällsvetenskap, Ekonomihögskolan, EHV.
2008 (engelsk)Independent thesis Advanced level (degree of Master (One Year)), 10 poäng / 15 hpOppgave
Abstract [en]

Background: Material handling is a large part of a company´s internal work and represents between 15 % and 70 % of the total cost of a manufactured product. By improving the internal handling of material, more efficient distribution and manufacturing flows are possible. The material handling process is an input to the production and assembly process that has to be defined and mapped so that it can be improved. The material handling process studied at Volvo CE Braås includes goods receiving, storage, packaging as well as the order/delivery process to assembly, and will finish with the material transport to the assembly line.

Research questions: How can the material handling process, from goods receiving to assembly line, at Volvo CE in Braås be described by using VSM? What kinds of waste can be identified? By proposing a future-state map, how can the identified problems and waste be reduced or eliminated?

Methodology: This thesis is a descriptive case study and was conducted with a deductive approach. Data was collected by our own observations, personal interviews, statistics, benchmarking and questionnaire. The scientific credibility of this thesis was secured by for example using many sources, avoidance of assumptions, studying a common process and following standardized steps of the VSM tool.

Conclusions: The material handling process was described in the separated areas of goods receiving, storage and assembly line. Visualization was given in a current-state map. Five different kinds of waste were identified. Finally, suggestions of improvements were presented along with a future-state map.

Suggestions on future research: A more detailed VSM including information flow and lead times could be studied. Scenario simulations of critical areas within the material handling process could be preformed. Furthermore, an ABC classification of articles and storage locations can be done to optimize storage.

sted, utgiver, år, opplag, sider
2008. , s. 140
Emneord [en]
Material handling, Volvo, Logistics, VSM, Goods receiving, Storage, Packaging, Assembly
HSV kategori
Identifikatorer
URN: urn:nbn:se:vxu:diva-2424OAI: oai:DiVA.org:vxu-2424DiVA, id: diva2:206359
Uppsök
samhälle/juridik
Veileder
Examiner
Tilgjengelig fra: 2008-11-18 Laget: 2008-11-18 Sist oppdatert: 2010-03-10bibliografisk kontrollert

Open Access i DiVA

fulltekst(4580 kB)9343 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 4580 kBChecksum SHA-1
045591e6f6d2d30f3e95ff751ff98482d7282f699a2b7a9af66cd64beaf4bedf5224bccb
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 9343 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 1345 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf