lnu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Prefabricerade hus - en fråga om kvalitet, ekonomi och byggtid
Växjö University, Faculty of Mathematics/Science/Technology, School of Technology and Design.
Växjö University, Faculty of Mathematics/Science/Technology, School of Technology and Design.
2006 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Syftet med detta examensarbete är att jämföra de två byggproduktionsmetoderna, industriellt/prefabricerat byggande och platsbygge. Vi undersöka om någon av metoderna är fördelaktigare än det andra, samt varför man allt mer använder sig av prefabricerat. Jämförelsen behandlar främst aspekterna byggtid, ekonomi och kvalitet. Genom en litteraturstudie och intervjuer med aktiva personer inom byggbranschen har vi införskaffat oss det material vi behöver.

Att bygga och montera så mycket som möjligt inne i fabrik gör att kvaliteten ökar då materialet inte utsätts för fukt och kyla före montering. Huset byggs upp mycket fortare då byggarbetsplatsen endast blir en montageplats av olika färdiga delar. Materiallager på bygget försvinner då delarna levereras när de ska monteras.

Levereras elementen i tid minskas också byggtiden, vilket i sig innebär lägre kostnader.

Abstract [en]

The main purpose with this diplomawork is to compare the two production methods,

premanufacturing and on-site construction. We want to investigate if one of the methods is more advantageous than the other and why premanufactured elements are used more often. The comparisons mostly consider aspects of building time, economy and quality. We gathered the material we needed through a literature study and by interviewing active persons in the building industry.

Building as much as possible in a production hall increases the quality since it’s not being exposed to moisture and cold before assembly. The house is built much faster when the building site becomes a montage place with different finished elements. There is no material storage at the building site since the elements are delivered when it’s time to assemble the specific element. If the elements are delivered when needed, building time will decrease which means reduced costs for the whole project.

Place, publisher, year, edition, pages
2006. , p. 65
Series
Reports from Växjö University: Mathematics, natural sciences and technology, ISSN 1404-045X ; TD 065/2006
Keywords [sv]
BYC 991, Prefab, industriellt byggande, platsbygge, elementbyggande
National Category
Construction Management
Identifiers
URN: urn:nbn:se:vxu:diva-940OAI: oai:DiVA.org:vxu-940DiVA, id: diva2:207268
Uppsok
teknik
Supervisors
Examiners
Available from: 2006-10-27 Created: 2006-10-27 Last updated: 2010-03-10Bibliographically approved

Open Access in DiVA

fulltext(1986 kB)5480 downloads
File information
File name FULLTEXT01.pdfFile size 1986 kBChecksum MD5
bf4556dc2721fe6cb3e7d75076e881f27cadd5c9e3eda12a5a9a919ad81d79fb202d0598
Type fulltextMimetype application/pdf

By organisation
School of Technology and Design
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 5480 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 3054 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf