lnu.sePublikasjoner
Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Ny elektrisk installation på Sjöfartshögskolans ångpanna: Ett projekt från planering till utförande
Linnéuniversitetet, Fakulteten för teknik (FTK), Sjöfartshögskolan (SJÖ).
Linnéuniversitetet, Fakulteten för teknik (FTK), Sjöfartshögskolan (SJÖ).
2013 (svensk)Independent thesis Basic level (university diploma), 10 poäng / 15 hpOppgave
Abstract [sv]

Sammanfattning

Sjöfartshögskolan i Kalmar förfogar över en ångpanna som används för att utbilda sjöingenjörer, drifttekniker samt driftingenjörer. Ångpannan används för att ge studenterna övning i att programmera ett styrsystem och för att de ska få kunskap om praktisk användning av reglerutrustning. Den ursprungliga elektriska installationen för ångpannans styr- och övervakningssystem var opraktiskt utformad för operatören, där dels en omkoppling i systemet var ett krav vid körning av olika laborationer och dels var utrustningen omodern. Det fanns även brister i installationens dokumentation och i samband med att Sjöfartshögskolan planerade en utbyggnad av anläggningen ansågs det som ett allt för komplicerat arbete i dess dåvarande utformning.

Syftet med uppdraget var att ta fram en lösning för en ny elektrisk installation till ångpannan, samt att praktiskt genomföra installationen. Målet är att operatören enkelt ska kunna köra anläggningen och göra val av olika laborationer utan att det skulle innefatta en omkoppling i installationen. Den elektriska installationen skulle också få ett nytt utseende, med en ny kapsling som bättre skulle representera en modern elektrisk installation. För att uppnå målet och för att slutföra uppdraget valdes projekt som metod som syftar till att planera och att utföra en specificerad uppgift.  Resultatet av projektet vart en ny elektrisk installation till Sjöfartshögskolans ångpanna som har en förbättrad säkerhet, bättre användarvänlighet för operatören och den har fått en ny modernare utformning. 

Abstract [en]

Abstract

Kalmar Maritime Academy has a boiler that is used for educating marine engineers, technicians and service engineers. The boiler is used to provide students with training in programming of the control system and also to gain practical knowledge of the control equipment. The original electrical installation for the control and monitoring system was impractically designed, where a switching of cable connections in the system was required when changing between different exercises. There were also absences of real documentation for the installation. Due to these circumstances, the Maritime Academy’s planned expansion of the facility was deemed to be too complicated in its current state. The purpose of our assignment was to develop a solution for a new electrical installation for the boiler and also the practical implementation of this new installation. The goal was for the operator to easily be able to operate the boiler and also to simplify the changeover between the different types of exercises without having to reconnect any cables. The electrical installation would also get a new look with a new housing that would better represent a modern electrical installation. To achieve the objectives for the assignment a project method was chosen, which is preferred when planning and for completion of a specific task. The result of this project where a new electrical installation to the Maritime Academy’s steam boiler that has an improved safety, better ease of use for the operator and has a new modern design.

sted, utgiver, år, opplag, sider
2013. , s. 110
HSV kategori
Identifikatorer
URN: urn:nbn:se:lnu:diva-25722OAI: oai:DiVA.org:lnu-25722DiVA, id: diva2:622363
Fag / kurs
Chief Engineer
Utdanningsprogram
Marine Engineering Programme (4 years) with onboard practical training placement, 180 credits
Veileder
Examiner
Tilgjengelig fra: 2013-05-22 Laget: 2013-05-21 Sist oppdatert: 2013-05-22bibliografisk kontrollert

Open Access i DiVA

Ny elektrisk installation på Sjöfartshögskolans ångpanna(2105 kB)462 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 2105 kBChecksum SHA-512
a0affbf763a8b0bc69d9162cff5817fcf573a979808b69c677d2da39de5e4b736daac5b1647589ccf14d808ddbf5f04c05ab0f71c50af89b5d5adfdf7752d1a2
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 462 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 421 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf