lnu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Brandskyddet i Göteborgs Hamn AB:s Energihamn: Ett projektarbete i fallstudieform för Göteborgs Hamn AB, som undersöker vilka förväntningar personal vid rederier och fartygsbefäl har på brandskyddet i Energihamnen, en hamnanläggning i Göteborgs Hamn AB.
Linnaeus University, Faculty of Technology, Kalmar Maritime Academy.
Linnaeus University, Faculty of Technology, Kalmar Maritime Academy.
2014 (Swedish)Independent thesis Basic level (university diploma), 180 HE creditsStudent thesis
Abstract [sv]

Detta uppdragsbaserade arbete är en del av ett stort projekt som Göteborgs Hamn AB driver, vars syfte är att förnya det nuvarande brandskyddet i Energihamnen och även möta framtida krav. Syftet med föreliggande studie var att undersöka vilka förväntningar personal vid rederier och fartygsbefäl som regelbundet anlöper Energihamnen har på Göteborgs Hamn AB:s brandskyddsutrustning och brandberedskapsplaner. Vidare undersöktes vilken brandskyddsutrustning några av de tankfartyg som regelbundet anlöper Energihamnen har ombord, även vilka krav som ligger till grund för den utrustningen. För att få svar på ovanstående syfte kombinerades intervjuer med personal vid tre rederikontor och fem fartygsbefäl från samma rederier med en litteraturstudie. Litteraturstudien består av en sammanställning av de regelverk som ställer specifika krav och rekommendationer för det brandskydd som ska finnas ombord på tankfartyg. Intervjuerna genomfördes för att bl.a. få fartygsnäringens förväntningar på Göteborgs Hamn AB vid nödsituationer under lastoperationer. Resultatet visar att flertalet informanter förväntar sig att Göteborgs Hamn AB bör ha brandskyddsutrustning på kaj som kan släcka bränder ombord på fartygsdäck. De förväntar sig också att hamnens beredskapsplaner ska vara väl inövade och ska snabbt dras igång vid en nödsituation.

Abstract [en]

This thesis is part of a major project that the Port of Gothenburg has embarked upon, and is produced as a result of a project directive. The purpose of that project is to renew its current fire protection in Energihamnen (the Energy Port) but also meet future requirements. The purpose of the present study is to examine what expectations shipping companies and ship´s officers, which regularly arrive to the Energy Port, have on the Port of Gothenburg’s fire prevention systems and fire emergency plans. Further investigated are the requirements that form the basis for the fire protection equipment onboard tankers that regularly arrive in the Energy Port. To obtain answers from the above mentioned purpose, interviews were conducted with three ship owners and five ship officers, and this was combined with a literature summary which consists of the regulatory framework that places specific requirements and recommendations for the fire prevention equipment that will be on board tankers. The interviews were conducted to include the shipping industry's expectations of the Port of Gothenburg’s emergency procedures during cargo operations. The result shows that the majority of respondents expected that the Port of Gothenburg should have firefighting equipment on their docks that can extinguish fires onboard the ship’s deck. They also expected that the port's emergency response plans should be well rehearsed and should also quickly come into force during an emergency.

Place, publisher, year, edition, pages
2014. , p. 85
Keywords [en]
The port of Gothenburg, fire equipment, continuous plans.
Keywords [sv]
Göteborgs Hamn AB, brandutrustning, beredskapsplaner
National Category
Marine Engineering Other Engineering and Technologies not elsewhere specified
Identifiers
URN: urn:nbn:se:lnu:diva-34596OAI: oai:DiVA.org:lnu-34596DiVA, id: diva2:721102
Educational program
Marine Engineering Programme (4 years) with onboard practical training placement, 180 credits
Supervisors
Examiners
Available from: 2014-06-03 Created: 2014-06-03 Last updated: 2014-09-02Bibliographically approved

Open Access in DiVA

Brandskyddet i Göteborgs Hamn AB:s Energihamn(912 kB)666 downloads
File information
File name FULLTEXT01.pdfFile size 912 kBChecksum SHA-512
77a118ae25f5e6474619eb9a28a3d2a782d367c585205485e9b6ec85ec34eaf0704756f7770c814eec0b89fdb9447768b9b4049f29fb907c1de9418623ea3eda
Type fulltextMimetype application/pdf

By organisation
Kalmar Maritime Academy
Marine EngineeringOther Engineering and Technologies not elsewhere specified

Search outside of DiVA

GoogleGoogle Scholar
Total: 666 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 2962 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf