lnu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Parallelldrift av generatorer: Att skapa ett förslag till M/S Solsund
Linnaeus University, Faculty of Technology, Kalmar Maritime Academy.
2020 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Parallell operation of generators (English)
Abstract [sv]

Projektet har tillkommit på uppdrag av Ölandsfärgan AB, målet var att utreda möjligheterna för parallelldrift ombord på rederiets fartyg M/S Solsund. Frågeställningen besvarades genom att ta fram ett förslag på en installation för parallelldrift. Kraven som ställdes i projektdirektivet var att installationen skulle följa gällande regelverk för denna typ av installation samt att elscheman över förslaget togs fram i enlighet med IEC-standard.

Ett tidigare examensarbete skrivit av Ottosson & Nordin (2015) där de har dokumenterat M/S Solsunds huvudinstrumenttavla användes för att kartlägga installationen. En besiktning av komponenterna ombord M/S Solsund genomfördes med avsikten att undersöka skicket och den fysiska layouten av dessa. I samband med besiktningen hade ägaren en förevisning av fartyget för att ge kunskap om den dagliga driften ombord. Förevisningen gav en bredare uppfattning över förutsättningarna för hur en framtida installation skulle kunna se ut. En viktig parameter i projektet har varit att fastställa vilket regelverk som gällde för M/S Solsund vilket i sin tur skulle användas för att utarbeta ett förslag på installationen. Utredningen ledde till att förslaget skulle följa klassningsbolaget Germanischer Lloyd regelverk för Elektriska installationer, I-1-3 Electrical installations. (GL I-1-3).

Vid utvärderingen av nuvarande installation och regelverk konstaterades att en modifikation av befintlig installation var nödvändig för att uppfylla kraven i projektdirektivet. Det konstruerades ett förslag på ett nytt övervakningsskåp för generatorerna innehållande nya komponenter som både kompletterade de generatorskydd som utvärderingen kom fram till fattades samt ersatte de skydd som var i det gamla övervakningsskåpet. De kompletterande komponenter som förslaget vill installera till varje generator var ett autosynkroniseringsdon som sköter in och utfasningen av generatorerna. Ett lastfördelningsdon som sköter både lasten vid normal drift och avlastningen vid utfasning av aktuell generator. Synkroniseringsskåp för indikering vid manuell infasning samt tre skyddsrelä innehållande överströms- och kortslutnings skydd, över- och under voltskydd samt ett överlastskydd som trippar non essential last ifall förbrukningen blir för hög.

De kompletterande ritningar som ritades över denna installation återfinns som bilaga 3 och följer IEC standarden och är tänkta att användas som underlag vid en eventuell installation. Resultatet blev två layoutscheman och fem kretsscheman

Abstract [en]

The project has been commissioned by Ölandsfärjan AB, to investigate the possibilities of paralleloperation of the auxiliary engines onboard the companies' vessel M/S Solsund. A draft over theinstallation was made after the requirements given by the projects directives. The requirements in thedirectives was as following: The installation should comply with the prevailing regulations for thistype of installation and the electrical schematics designed to comply with the IEC standard.A background check was done before the commission started. In combination of inspections on boardto get the information about the condition and the physical layout of the components onboard,electrical drawings made in earlier project at Kalmar maritime academy was used to examine theship's main switchboard. To gain knowledge of how the owner operates the ship and to get ideas forthe installation, a demonstration was given by the owner. An important variable to this project was todetermine which regulations applied to this kind of ship. The investigation concluded that the shipsinstallation should follow classification company Germanischer Lloyd regulations for electricalinstallations.After evaluating the current installation and regulations, the conclusion was, that modification ofexisting installation was needed to fulfill the requirements of the project directives. The suggestedproduct to be manufactured was a new monitoring cabinet existing of new protection relays, howwould replace both the old protections in previous cabinet and adds supplemented protections neededfor this kind of installation. Components to be installed in the new suggestion are following: Autosynchronizer, Load sharer relay with included unloading and a reverse power protection.Synchroscope used when manually synchronize the auxiliary engines, and three protection relays; one3 phase over current and short circuit relay, one voltage relay (over and under) and at last one powerrelay for the bus bar used for tripping of non essential consumers.All constructed electrical drawings follows the IEC-standard and are intended to be used as a basis forthe installation. The drawings that were constructed are the following: - Layout diagram of the mainswitchboard and the new monitoring cabinet. - Circuit diagrams for both generators included themonitoring cabinets, and a part list over the components in the electrical schemes. All drawings wereconstructed in the computer program Easy EL.

Place, publisher, year, edition, pages
2020. , p. 14
Keywords [sv]
Parallelldrift, M/S Solsund, Germanischer Lloyd, Kretsscheman.
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:lnu:diva-93363OAI: oai:DiVA.org:lnu-93363DiVA, id: diva2:1422967
External cooperation
Ölandsfärjan AB
Subject / course
Chief Engineer
Educational program
Marine Engineering Programme (4 years) with onboard practical training placement, 180 credits
Presentation
2020-04-10, Ma 222, Landgången 4, 392 31, Kalmar, 13:22 (Swedish)
Examiners
Available from: 2020-04-14 Created: 2020-04-10 Last updated: 2022-02-22Bibliographically approved

Open Access in DiVA

No full text in DiVA

Search in DiVA

By author/editor
Medhammar, Manfred
By organisation
Kalmar Maritime Academy
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 244 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf