lnu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Råvatten av rökgaskondensat: En behovsanalys genom kartering av råvattenflöden för kraftvärmeverket Torsvik.
Linnaeus University, Faculty of Technology, Kalmar Maritime Academy.
Linnaeus University, Faculty of Technology, Kalmar Maritime Academy.
2023 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Sustainable development
SDG 6: Ensure availability and sustainable management of water and sanitation for all
Abstract [sv]

En kartläggning av vattenåtgång för kraftvärmeverket Torsvik visar att en självförsörjning av råvatten inte är möjlig genom att endast nyttja återcirkulation av renat rökgaskondensat. Att helt utesluta användandet stadsvatten som råvatten för att säkerställa spädvattenbehovet till pannorna är därför ej möjligt, men med hjälp av utökad rening och återcirkulation kan en resurseffektivisering ske på anläggningen. Resultatet visar på att en nyinvestering av lämplig teknik så som UFRO eller likvärdigt för kondensatrening måste ersätta den befintliga flockteknikensom idag används för avfallspannan på KVVT1, för att återcirkulation av kondensat skall vara ett möjligt alternativ för detta block. Vidare finns kvarvarande problematik med otillräckligt flöde av rökgaskondensat hos detta block för att bli självförsörjande av spädvatten. Möjligheterna för KVVT2 att bli självförsörjande är dock desto bättre där ett högre flöde av rökgaskondensat uppnås. För detta block krävs då en uppskalning av den befintliga rökgaskondensatreningen (UF/RO), då det inte täcker hela flödet i dagsläget.Referensanläggningar runt om i Sverige visar att det är möjligt att genomföra ett sådant projekt. Vidare finns det direktiv från EU genom BAT slutsatserna samt nationella bidrag att söka för projekt inom området för att nå de mål som är uppsatta globalt i och med Agenda30 åtagandet. Tidigare studier inom området påvisar att den tekniska utrustning som finns för området är välfungerande och att det finns mer än en fungerande lösning. Dock visar de även på att en anläggningsspecifik analys måste göras då de olika parametrarna varierar hos de olika anläggningarna där det lyfts fram att en pilotanläggning kan vara ett sätt att skära ner tiden för att få parametrarna att fungera korrekt på där flera anläggningar tagit mer än två år att bli driftsatta efter installation. Även Miljötillstånden varierar för de olika anläggningarna och det finns därmed ingen universallösning. Denna rapport sammanställer kraftvärmeverket Torsviks förutsättningar samt ställer dessa mot befintliga metoder hos liknande kraftvärmeverk med en behovsanalys genom kartering av råvattenflöden. Genom att ha kartlagt befintliga flödesmätare på Torsvik och trend analyserat dess data i anläggningens styrsystem har vi kommit fram till dess behov av råvatten för de olika processerna. Med hjälp av intervjuer och interna utredningar har vi skapat en tydligare bild av anläggningens vattenflöden samt gett rekommendationer av lämpliga metoder för att rena rökgaskondensatet för att minska vatteninköpet från stadsnätet.

Abstract [en]

A survey of water usage for the Torsvik power cogeneration plant showsthat self-sufficiency in raw water is not possible through solely recycling purifiedflue gas condensate. Completely excluding the use of municipal water as raw waterto meet the make-up water demand for the boilers is therefore not possible, but withthe help of enhanced purification and recycling, resource efficiency can be achievedat the facility. The results indicate that a new investment in appropriate technologysuch as UF-RO or equivalent for condensate treatment must replace the existingflocculation technology used for the waste boiler at KVVT1, in order for condensaterecycling to be a feasible alternative for this block. Furthermore, there is aremaining issue of insufficient flow of flue gas condensate for this block to achieveself-sufficiency. However, the possibilities for KVVT2 to become self-sufficient arebetter, with a higher flow of flue gas condensate. For this block, an upscaling of theexisting flue gas condensate treatment on block 2 is required as it does not meet thedemand.Reference facilities across Sweden demonstrate the feasibility ofimplementation. Furthermore, there are directives from the EU through BATconclusions, as well as national grants available for projects in this field to achievethe goals set globally with the Agenda30 commitment. Previous studies in the fielddemonstrate that the technical equipment available for this area is functioning welland that there is more than one viable solution. However, they also highlight theneed for site-specific analysis as the different parameters vary among differentfacilities, where it is emphasized that a pilot plant can be a way to reduce the time ittakes for the parameters to function correctly, as several facilities have taken morethan two years to become operational after installation. Environmental permits alsovary for different facilities, thus there is no universal solution.Therefore, this report compiles the conditions of the Torsvik powercogeneration plant and compares them with existing methods at similar powercogeneration plants. By mapping the existing flow meters at Torsvik and trendingthe data in the facility's control system, we have determined its raw waterrequirements for the different processes. Interviews and internal investigations havehelped us create a clearer picture of the facility's water flow.

Place, publisher, year, edition, pages
2023. , p. 59
Keywords [sv]
Rökgaskondensering, Vatten återcirkulering, Kraftvärmeverk
National Category
Water Treatment
Identifiers
URN: urn:nbn:se:lnu:diva-125274OAI: oai:DiVA.org:lnu-125274DiVA, id: diva2:1806782
External cooperation
Jönköping Energi
Subject / course
Chief Engineer
Educational program
Marine Engineering Programme (4 years) with onboard practical training placement, 180 credits
Presentation
2023-06-07, RTC/Zoom, 14:31 (Swedish)
Supervisors
Examiners
Available from: 2023-10-25 Created: 2023-10-24 Last updated: 2023-10-25Bibliographically approved

Open Access in DiVA

fulltext(1945 kB)347 downloads
File information
File name FULLTEXT01.pdfFile size 1945 kBChecksum SHA-512
83b90b5e6925ffff7745cc6370d44228317187e6fc6c79eebbe92ef5bc253f4ba86887ea883e83b356b969694544f37c429968271bab06e80708511ccb62f054
Type fulltextMimetype application/pdf

By organisation
Kalmar Maritime Academy
Water Treatment

Search outside of DiVA

GoogleGoogle Scholar
Total: 347 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 290 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf