lnu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Mätning av produktionstiden vid prefabricerade hus: En tidsstudie vid Sävsjö Trähus AB
Växjö University, Faculty of Mathematics/Science/Technology, School of Technology and Design.
2007 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Vid prissättning av ett hus ingår produktionskostnaden och den utgör en stor andel av det totala priset. I produktionskostnaden ingår material, avskrivning samt löner. Kostnaden för löner är den mest svårbedömda eftersom husens storlek och arkitektur aldrig är lika. Ansvarige för offert och avtal använder sig idag av olika tillverkningsfaktorer vid beräkning och framtagning av offerter. Dessa är baserade på många års erfarenhet, där enheten antingen är timme/m2 eller timme/st beroende på vilken faktor som avses. Idag har man full kontroll över det totala täckningsbidraget, men det finns en viss osäkerhet vad gäller fördelningen mellan husen eftersom det ständigt cirkulerar flera hus i produktionen. I föreliggande examensarbete har ett flertal tidsstudier utförts för att granska tillverkningsfaktorerna och relationen mellan dem. Fabrikens produktionsflöde styrs av tillverkningen av ytterväggar varefter arbetet avgränsades till att främst mäta stationerna som monterar dessa. Resultatet av tidsstudien pekar på att yttervägg gjord i linan och gavelvägg gjord i vändbänken har en för hög faktor i det nuvarande systemet. Vidare mättes fönster som monterades löst i ett färdigt block och fönster som reglades i fönsterbänk. Båda dessa faktorer resulterade i en för låg faktor jämfört med nuvarande. Andra faktorer som mättes var yttervägg vändbänk, gavelspets och locpanel. I samband med tidsstudien, som utfördes under totalt 4 veckors tid, granskades även produktionsprocessen vilket resulterade i några förslag på åtgärder som förbättrar effektivitet, kvalitet och säkerhet i fabriken. Att fördela arbetet på ett bättre sätt i linan vid produktion av panelhus är ett av förslagen som skulle höja effektiviteten.

Abstract [en]

Price-setting of a house includes production-cost and the production-cost is a substanial part of the total price. In production-cost are material, write-offs and salaries included. The last mentioned factor is the one that is most difficult to determine since the house-sizes and architectures never are the same. The person responsible for tender and making deals are today using factors of manufacturing which are based upon many years of experience and where the measurement is either h/m2 or h/pc depending on which factor one uses. The total covering-costs is good totally, but one does not know whether the proportions between different house-types is accurate since it constantly circulates multiple different houses in production. In this examination-work has multiple time-studies been made to research the factors of manufacturing and the proportion of them. The production-flow of the factory is controlled of the manufacturing of outer-walls and therefore the studies narrowed down to measure the stations that are assembling these. The results of the time-study showed tendencies that outer-walls made in the line and gables made at the turning-table have a factor that is high in the present system. Windows that was installed loose in a partition and windows that were studded in windowsill were also measured. Both these factors resulted in a low factor comparing to the presence.During the time-study, that lasted four weeks of time, was even the production-process researched and resulted in suggestions for changes that could increase efficiency, quality and security in the factory. One of the suggestions that could result in more efficiency was dividing the workload more efficiently in production of prefabricated houses.

Place, publisher, year, edition, pages
2007. , p. 36
Keywords [sv]
Sävsjö Trähus AB, Tidsstudie, Tillverkning
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:vxu:diva-1527OAI: oai:DiVA.org:vxu-1527DiVA, id: diva2:205349
Uppsok
teknik
Supervisors
Examiners
Available from: 2007-08-22 Created: 2007-08-22 Last updated: 2010-03-10Bibliographically approved

Open Access in DiVA

fulltext(4570 kB)1078 downloads
File information
File name FULLTEXT01.pdfFile size 4570 kBChecksum MD5
bb060dbd2c35e7605835932261f65974951242dcc42e69d88bd4425163ac6c878dd86ade
Type fulltextMimetype application/pdf

By organisation
School of Technology and Design
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 1078 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1188 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf