lnu.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Processutveckling i leksaksindustrin: - sänkt produktionskostnad vid tillverkning av rälsdetaljer
Växjö University, Faculty of Mathematics/Science/Technology, School of Technology and Design.
2004 (Swedish)Independent thesis Basic level (degree of Bachelor)Student thesisAlternative title
Process development fro the toy Industry : - lower productioncost in manufacuring of raildetails (English)
Abstract [sv]

Följande arbete är utfört på Micki Leksaker AB. Företaget är ett familjeägt aktiebolag som framförallt säljer, men även utvecklar och tillverkar leksaker anpassade för barn mellan 0-8 år. Rapporten berör processutveckling inom företagets produktion av rälsdetaljer i trä, med mål att finna en minskad produktionskostnad. För att uppnå målet har det utförts tids- och fältstudier över nuvarande produktionsprocess, efter analys av dagsläget har planritningar och krav på teknisk utrustning bearbetats. Resultatet blev att en del större investeringar är nödvändiga för att genomföra föreslagna förändringar i produktionsutformningen, något som ändå snabbt skulle bli lönsamt vid till exempel tillverkning av detaljen krokig räls.

Abstract [en]

The following diploma work is performed at Micki Leksaker AB. The company above all sells, but also develops and produce toys adjust for children between 0-8 years old. This report is about developing process within the company's production of raildetails in wood, with the purpose to find a lower productioncost. To reach the goal time studies and field work has been made at the production of today and after analysing the present situation, plans ande demands for technical equipment has been worked through. The result showed that some larger investment are necessary to accomplish the proposed changes in the design of the production, however something that would give a short "pay-back".

Place, publisher, year, edition, pages
Växjö: Institutionen för teknik och design , 2004. , p. 40
Keywords [en]
vision system, integration, raildetails, computer plan
Keywords [sv]
TSC990, optisk avsyning, integrering, rälsdetaljer, planritning
Identifiers
URN: urn:nbn:se:vxu:diva-303OAI: oai:DiVA.org:vxu-303DiVA, id: diva2:206599
Supervisors
Available from: 2005-10-12 Created: 2005-10-12 Last updated: 2010-03-10Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
School of Technology and Design

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 110 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf