lnu.sePublikationer
Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
A Model for Assessing Cost Effectiveness of Facility Layouts – A Case Study
Växjö universitet, Fakulteten för matematik/naturvetenskap/teknik, Institutionen för teknik och design.
2007 (Engelska)Ingår i: The 2nd International Conference on Operations and Supply Chain Management (OSCM), 18 – 20 May, 2007, Bangkok THAILAND: Regional and Global Logistics and Supply Chain Management, New UM Ad. Co. Ltd. , 2007Konferensbidrag, Publicerat paper (Refereegranskat)
Abstract [en]

The paper presents a model for assessing cost effectiveness of facility layout alternatives. The model is a five-phase procedure including evaluating current layout in phase 1. In phase 2, feasible layout alternatives are generated. Phase 3 and phase 4 provide evaluation based on tangible and intangible factors. Phase 5 prefers a layout alternative based on multiple criteria decision making tools. Economical and working environmental aspects are considered in the evaluation process utilizing tools such as Life Cycle Cost Analyses (LCCA) and Multi Criteria Decision Making (MCDM). Factors reflecting life-cycle consideration include development, investment, usage, and scrapping. Non-economic evaluation elements are also considered in the MCDM. To test the proposed model, a case study is performed at the Swedish Mail Terminal in the town of Alvesta, a part of Posten Sweden AB. The terminal has several space, machine, and operational constraints. The three layout alternatives investigated are suggested by the authors, by the branch management, and by the Posten Sweden AB management personal. Result obtained from the study show that the layout alternative with the most implementation cost yields a nine percent better total LCC than the closest alternative based on ten years life cycle length. The paper provides a generalized layout evaluation procedure for manufacturing companies. Further research is required to customize the proposed procedure for evaluating alternative service facilities.

Ort, förlag, år, upplaga, sidor
New UM Ad. Co. Ltd. , 2007.
Nyckelord [en]
Facility planning, Layout Evaluation, Life Cycle Cost Analysis (LCCA), Multi Criteria Decision Making (MCDM), Sweden
Forskningsämne
Teknik, Systemekonomi
Identifikatorer
URN: urn:nbn:se:vxu:diva-2988ISBN: 974677637-1 (tryckt)OAI: oai:DiVA.org:vxu-2988DiVA, id: diva2:202944
Tillgänglig från: 2007-12-31 Skapad: 2007-12-31 Senast uppdaterad: 2010-03-09Bibliografiskt granskad

Open Access i DiVA

Fulltext saknas i DiVA

Övriga länkar

http://utcc2.utcc.ac.th/oscm2007/

Person

Ciganovic, RenatoAlsyouf, Imad

Sök vidare i DiVA

Av författaren/redaktören
Ciganovic, RenatoAlsyouf, Imad
Av organisationen
Institutionen för teknik och design

Sök vidare utanför DiVA

GoogleGoogle Scholar

isbn
urn-nbn

Altmetricpoäng

isbn
urn-nbn
Totalt: 170 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf