Examensarbete är gjort under vårterminen 2005 som en avslutande del av ingenjörsutbildningen i maskinteknik.
This diploma work was made at Elitfönster AB who is the biggest window manufacture in Sweden. The task was to make a time and motion study on a plane line witch creates window frames. The purpose was to se if it would be possible to increase the machines availably time and thus increase the production.