Ledtidsreducering ur ett värdeflödes-perspektiv
2013 (Swedish)Independent thesis Basic level (degree of Bachelor), 15 credits / 22,5 HE credits
Student thesis
Abstract [en]
This case study is performed within the production of Sherwin-Williams, Bellö. The purpose is to increase the understanding how a value stream can function more efficient, from a lead time perspective. With the analytical model that is build up on known theories, the purpose have been fulfilled. Mapping of value and non value time for four products thru their respectively process reveals wastes, which is, waiting, transport and movement, incorrect processing and set-up time that in it self create transport and movement. Thru identified wastes that causes loss in lead time suggestions of improvement has been proposed. This to show solutions that can create a more effective flow with reduced non value time.
Place, publisher, year, edition, pages
2013. , p. 85
Keywords [sv]
Värdeflödeskartläggning, värdeflöde, ledtid, processkartläggning, värdeskapande, icke värdeskapande, slöseri, förbättringsförslag
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:lnu:diva-28514OAI: oai:DiVA.org:lnu-28514DiVA, id: diva2:643415
Subject / course
Technology
Educational program
Industrial Engineering Programme with specialization in Management and Production, 180 credits
Uppsok
Technology
Supervisors
Examiners
2013-08-272013-08-272013-08-27Bibliographically approved